TL;DR
Give Muse a small sample of your sheet and tell it which column identifies the same record across imports. That lets it update a row after a title or count changes without creating a second copy.
- Use fictitious rows for the first build.
- Decide whether each number is a current total or a change to apply.
- Run the same import twice and check the row count before importing real data.
Start with an equipment cupboard
Suppose a club currently lends equipment from a sheet. Two identical blue tents belong to different storage rooms. A title such as “Blue tent” cannot identify the item. Give each inventory line a stable ID. In this example, available is a snapshot of the count on the shelf.
item_id,name,room,available
T-01,Blue tent,North,2
T-02,Blue tent,South,1
L-03,Camp lantern,North,4
After connecting Muse to floo, paste the sample with this request:
Read https://getfloo.com/agents.md. Build an invite-only equipment list with Postgres on floo. Ask before provisioning paid services. Let me preview a CSV import and confirm it. Match existing rows by item_id. Replace the available count with the supplied whole number. Reject missing IDs, repeated IDs within the file and negative counts. Keep items omitted from the file. Give me the dev URL and wait before releasing to prod.
Prove that a second import is safe
Import the sample in dev. You should see three inventory lines and seven available units. Import the exact same file again. Both totals should stay the same. Now change only T-01 from 2 to 1. The result should be three lines and six units. Leave T-02 out of the next file and check that the South room still has its tent.
Try a file containing both a valid change and a negative count. Ask Muse to reject the entire import and show the offending line before writing any changes. If tomorrow you want to record “one tent checked out,” give that transaction its own ID and history. Subtracting one twice is a different problem from importing the same snapshot twice.
Keep the source sheet until someone else has checked the totals. If your first project starts without a spreadsheet, the shared reading list guide is a smaller first build.