TL;DR
Give each piece an ID before sending the roster for approval. When a buyer changes a name, issue a new proof for the affected piece and require approval of that exact revision.
- Keep spelling, accents and line breaks exactly as supplied.
- Separate the event deadline from the last time the shop can accept a change.
- Print the piece ID and approved revision on the production ticket.
One roster, two people with the same name
Suppose a school orders 40 plaques. Two recipients are named Sam Lee. Only one won the relay. Assign each plaque an order line such as A17 or A32, then store the recipient, award, engraving lines and due date against that ID. A duplicate-name check should ask a human to review both rows. Automatically deleting one would leave a student without a plaque.
A correction arrives after sign-off
| Piece | Approved proof | Requested change | Production decision |
|---|---|---|---|
| A17 | v2, Sam Lee, Relay | Change Relay to Captain | Hold A17 pending v3 |
| A32 | v2, Sam Lee, Sprint | None | Release v2 if the job permits partial runs |
Keep v2 in the order history. Send the buyer v3 showing both the old and new inscription, with the line breaks as they will be engraved. Record who approved it and when. If the buyer approved a single PDF for the entire roster, reissue that packet and hold the batch until they approve the replacement. If the machine already ran, route the change to the person authorized to quote a remake.
Check the handoff before the next ceremony
Open the old approval link after v3 exists. It should show that v2 was superseded and give the buyer the current proof. Hand a second person the production ticket. They should be able to identify exactly which file to engrave without reading the email thread. Compare remakes and missed pickup times with the last comparable order. Example of a shop’s proof and production policy